From configuration to installation as fast as 12 weeks dependent on current build schedules.

1

Configure & Order

Use our online configurator to select your model, tier, finishes, and add-ons. Submit your order with a deposit to reserve your build slot.

  • Select your model: Borah, Borah Loft, or Mesa
  • Choose Standard or Luxury tier
  • Customize finishes and add-ons
  • Review pricing and delivery estimate
  • $5,000 refundable deposit to reserve
2

Design Confirmation

Our team reviews your configuration, confirms material availability, and produces final construction documents. You'll approve the final design before we begin.

  • Dedicated project coordinator assigned
  • Final floor plan and elevation drawings
  • Material and finish confirmation
  • Engineering review and stamping
  • Your sign-off before build begins
3

Permitting Assistance

We prepare and submit all documentation your local building department requires. We handle the back-and-forth so you don't have to.

  • Complete permit-ready drawing package
  • Structural engineering certification
  • Energy compliance documentation
  • Direct communication with your building department
  • Timeline varies by jurisdiction
4

Factory Build

Your home is built in our climate-controlled facility by experienced craftspeople. Quality inspections at every stage. You'll receive progress photos throughout.

  • Steel frame and structural assembly
  • Insulation, electrical, and plumbing rough-in
  • Interior finish installation
  • Appliance and fixture installation
  • Multi-point quality inspection
  • Progress photo updates
5

Delivery & Setup

Your completed home is transported to your site and professionally installed on your prepared foundation. Our crew handles placement, leveling, and utility connections.

  • Professional transport to your site
  • Crane or roll-off placement on foundation
  • Leveling and anchoring
  • Utility connections (water, sewer, electric)
  • Systems testing and commissioning
6

Final Walkthrough

We walk through your completed home together. Any items are documented and resolved before we hand you the keys.

  • Comprehensive walkthrough with your coordinator
  • Systems operation demonstration
  • Punch list documentation and resolution
  • Warranty documentation and registration
  • Keys handed over — you're home

Site Readiness Checklist

Here’s what needs to happen before your home arrives. We’ll guide you through every item.

Owner Responsibility
Montera Handles

Foundation or pier system installed

Per Montera engineering specifications provided after order. Must be inspected and approved before delivery.

Water supply stubbed to site

Municipal water connection or well with pressure tank. 3/4" PEX or copper stub within 10' of home location.

Sewer/septic connection

Municipal sewer tie-in or approved septic system. 3" ABS or PVC stub within 10' of home location.

Electrical service installed

Meter base and panel (30-amp or 50-amp per your model) installed by licensed electrician. Within 25' of home.

Clear delivery access

Minimum 14' wide and 14' tall clearance from road to home site. No turns tighter than 50' radius.

Level, firm ground at home site

Compacted gravel pad or concrete slab. No standing water or soft soil at placement area.

Local permits obtained

Building permit and any required zoning approvals. Montera provides all documentation — owner files with jurisdiction.

Engineering and construction documents

Complete drawing package, structural calculations, and energy compliance docs provided by Montera.

Home construction and quality inspection

Factory build with multi-point inspection. Progress photos provided throughout.

Delivery, placement, and setup

Professional transport, crane placement, leveling, anchoring, and utility hookup by Montera crew.

Permits: What We Handle vs. What You Handle

Montera provides everything your building department needs: complete architectural plans, structural engineering calculations, energy compliance documentation, and specification sheets. We communicate directly with your local jurisdiction and handle the back-and-forth.

The homeowner is the permit applicant on record and responsible for any application fees. In most cases, our documentation package is all your jurisdiction requires. We walk you through the process from start to finish.

Montera Provides

  • Architectural plans
  • Structural engineering
  • Energy compliance docs
  • Jurisdiction communication

Owner Handles

  • Permit application filing
  • Application fees
  • Local inspections
  • Zoning verification

Ready to Start?

Configure your Montera home in minutes. Choose your model, tier, finishes, and add-ons — and see your complete price instantly.